Monday, 30 January 2017
Ground Floor - scaffold up
Slight problem with the 3rd garage - a mistake from 8880mm being measured as 8800mm which has caused the garage door width to be wrong. Give them their dues they pulled the wall down so the frame can be moved and corrected.
Friday, 13 January 2017
Ground Floor - Bricks
Tradies have come back to work after the Christmas break and the house has started again. 5 days of brick laying and the ground floor is almost finished. Amazing what 6 guys can do.